705 — Setback Requirements
Chapter 7: BUSINESS CORRIDOR DISTRICT REGULATIONS • Effective Mar 5, 2025
Minimum Side Setback and Rear Setback
(Minimum width from side yard line, rear yard
Minimum Front line, or additional street frontage)
Setback Abuts Abuts Lot in Abuts 2nd
(Minimum depth Residential BC or SRB Street
Building or use from right-of-way) zoning district District Frontage
Any permitted main 50 50 20 50
building or use
Conditional Uses:
Buildings 50 50 20 50
Outdoor Display 30 50 10 50
Outdoor Storage Use is not
permitted in front 50 20 50
setback
Accessory Building 50 50 20 50
Parking Area 30 50 10 30
Loading Facility 50 50 20 50
• All distances measured in feet
• 2nd street means any additional street frontage where a lot has frontage on more than one
street
a. Minimum Front Yard Depth: Front Yards: Additional Standards
1. Except for access drives and sidewalks, the front thirty (30) feet of the required front yard
(s) shall be landscaped as provided in this Resolution. Note also frontage landscape strip
requirements at 709(3).
2. On all corner lots or other parcels having frontage on two or more streets, the minimum
front yard depth and front yard landscaping shall be provided on each street frontage.
b. Rear Yards: Additional Standards
1. An accessory building shall only be located in the rear yard or in a side yard that does not
abut a street frontage.
2. On corner lots or other parcels having frontage on two or more streets, the rear yard shall
be on the side of the lot located behind the front yard which is located on the major
highway, or behind the front yard which has the most frontage on a major highway.
3. On corner lots having equal or nearly equal frontage on two major highways or on no major
highways, but on two or more township roads, the rear yard may be designated by the lot
owner with approval of the Zoning Inspector to be opposite either one of the front yards.
4. For the purposes of 2. and 3. above “major highway” means Akron-Cleveland Road or
Kendall Park Road.
